EN 10204 certificates explained.

EN 10204 defines four inspection documents for metallic products. Types 2.1 and 2.2 come from the manufacturer without lot-specific testing; 3.1 reports tests on the delivered lot, validated by an independent inspection representative; 3.2 adds the purchaser's or an official inspector's validation.

Reviewed 11 Nov 2026 · Based on EN 10204:2004 Metallic products — Types of inspection documents · Report an error

Questions on this?

What does your order require?
3.1EN 10204 document type

A 3.1 certificate reports specific inspection on the delivered products, validated by an inspection representative independent of manufacturing.

Agree the document type in the order: it cannot be upgraded after delivery. We confirm which types the manufacturer can provide when we quote.

EN 10204 inspection document types
TypeDocumentContentsValidated by
2.1Declaration of compliance with the orderStatement of compliance, no test resultsManufacturer
2.2Test reportResults of non-specific inspection (typical production results)Manufacturer
3.1Inspection certificate 3.1Results of specific inspection on the delivered productsManufacturer's authorised inspection representative, independent of manufacturing
3.2Inspection certificate 3.2Results of specific inspection on the delivered productsManufacturer's independent representative and the purchaser's representative or an inspector named in official regulations
Source: EN 10204:2004.

Reference values, not a design.

Values are the nominal figures of the cited standards, or calculated from them where marked. The governing standard and your drawing always take precedence.

All tools

Questions buyers ask.

What is the difference between EN 10204 3.1 and 3.2?

Both report tests on the delivered products. A 3.1 certificate is validated by the manufacturer's authorised inspection representative, independent of manufacturing; a 3.2 is validated by that representative and by the purchaser's representative or an inspector named in official regulations.

Can a 2.2 test report be upgraded to 3.1 after delivery?

No. The document type must be agreed in the order, because a 3.1 or 3.2 depends on specific inspection of the lot before it ships.